Projects

Automation Upgrade at Compagnie Sucrière Sénégalaise

Automation Upgrade at Compagnie Sucrière Sénégalaise

Year of Completion: 2008
Site: Senegal
Client: CSS 
Year of Completion: 2008
Site: Senegal
Client: CSS 
 

The project consisted of replacing old Schneider Telemecanique PLC with ABB Freelance system as it was already present in other part of the plant. The older ABB controller was also replaced by the AC800F

Revamping of Control System of Turbine at CEL

Revamping of Control System of Turbine at CEL

Revamping of Control System of Turbine at CEL

Year of Completion: 2008
Site: Flacq
Client: CEL

The project consisted of replacing the existing SCADA system with PcVue. The PLC being Mitsubishi Melsec. ECS was responsible for the Design, Implementation and Commissioning of the system.

 Consolidated Energy Ltd Power Station (CEL)

Replacing the Boiler Old Control System at CEL

Replacing the Boiler Old Control System at CEL

Year of Completion: 2007
Site: Flacq
Client: CEL

The CEL boiler control system was based on an obsolete Modumat system. The project consisted of replacing the latter with an ABB AC800F Freelance system.

Compagnie Thermique de Savannah - CTSAV

Compagnie Thermique de Savannah - CTSAV

Compagnie Thermique de Savannah - CTSAV

Year of Completion: 2007
Site: Savannah
Client: CTSAV

ECS has worked with Alstom Australia for the design and commissioning of the automation of the boilers. All motor starters were designed with Siemens Simocode motor controller. Packages with their own Siemens PLCs such as the Water treatment Plant, Electrostatic precipitator and Sooth Blower System were connected to the main DCS via a fibre optic ring network using Siemens Scalance.

Electrical Installations at Jeetoo Hospital

Electrical Installations at Jeetoo Hospital

Electrical Installations at Jeetoo Hospital

Year of Completion: 2006
Site: Port-Louis
Client: Jeetoo Hospital

Electrical Installation Design, Supply and Installation Supply were done by ECS.

Omnicane Sugar Factory

Complete Automation of Omnicane Sugar Factory

Complete Automation of Omnicane Sugar Factory

Year of Completion: 2005
Site: Saint-Aubin
Client: Omnicane

The Automation system of Omnicane Sugar Factory is based on five AC800F controllers with seven Digivis Operator Stations. All IOs are of remote type and connected to the controllers via profibus.

Omnicane Group - CTDS Coal fired power stations

CTDS 35 MW Coal Fired Power Station

CTDS 35 MW Coal Fired Power Station

Year of Completion: 2005
Site: Saint-Aubin
Client: Omnicane Group

The automation system is based on the GEFanuc SCADA system with two redundant 9030 PLCs connected to IOs on Genius networks.

Most instrumentation was supplied by ECS and all instrumentation installation and commissioning works were done by ECS.

 

Electrical Infrastructure at Domaine Rosalie

Electrical Infrastructure at Domaine Rosalie

Electrical Infrastructure at Domaine Rosalie

Year of Completion: 2002
Site: Le Mount Sugar Estate
Client: Domaine Rosalie

Design, supply and Installation of complete Electrical System was done by ECS.

 

Grays Distillery

New Control System for Grays

New Control System for Grays

Design, Supply and Installation of a complete control system was done by ECS.

Year of Completion: 2002
Site: Beau Plan
Client: Grays Ltd

Know More

Cold Rooms

Electrical Works for Renovation of Cold Rooms

Electrical Works for Renovation of Cold Rooms

Year of Completion: 2002
Site: Moka
Client: Agricultural Marketing Board

Electrical Installation, Design, supply and Installation of complete Electrical System was done by ECS.

Where are WE

Keep in Touch

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Electrical & Control Specialists Ltd

Office:
Mon Loisir Industrial Zone
Riviere du Rempart

Phone: (230) 260 0862

Email: ecs@ecs.mu