Projects

Automation Upgrade at Compagnie Sucrière Sénégalaise
Automation Upgrade at Compagnie Sucrière Sénégalaise
Year of Completion: 2008Site: Senegal
Client: CSS
Year of Completion: 2008
Site: Senegal
Client: CSS
The project consisted of replacing old Schneider Telemecanique PLC with ABB Freelance system as it was already present in other part of the plant. The older ABB controller was also replaced by the AC800F

Revamping of Control System of Turbine at CEL
Revamping of Control System of Turbine at CEL
Year of Completion: 2008Site: Flacq
Client: CEL
The project consisted of replacing the existing SCADA system with PcVue. The PLC being Mitsubishi Melsec. ECS was responsible for the Design, Implementation and Commissioning of the system.

Replacing the Boiler Old Control System at CEL
Replacing the Boiler Old Control System at CEL
Year of Completion: 2007Site: Flacq
Client: CEL
The CEL boiler control system was based on an obsolete Modumat system. The project consisted of replacing the latter with an ABB AC800F Freelance system.

Compagnie Thermique de Savannah - CTSAV
Compagnie Thermique de Savannah - CTSAV
Year of Completion: 2007Site: Savannah
Client: CTSAV
ECS has worked with Alstom Australia for the design and commissioning of the automation of the boilers. All motor starters were designed with Siemens Simocode motor controller. Packages with their own Siemens PLCs such as the Water treatment Plant, Electrostatic precipitator and Sooth Blower System were connected to the main DCS via a fibre optic ring network using Siemens Scalance.

Electrical Installations at Jeetoo Hospital
Electrical Installations at Jeetoo Hospital
Year of Completion: 2006Site: Port-Louis
Client: Jeetoo Hospital
Electrical Installation Design, Supply and Installation Supply were done by ECS.

Complete Automation of Omnicane Sugar Factory
Complete Automation of Omnicane Sugar Factory
Year of Completion: 2005Site: Saint-Aubin
Client: Omnicane
The Automation system of Omnicane Sugar Factory is based on five AC800F controllers with seven Digivis Operator Stations. All IOs are of remote type and connected to the controllers via profibus.

CTDS 35 MW Coal Fired Power Station
CTDS 35 MW Coal Fired Power Station
Year of Completion: 2005Site: Saint-Aubin
Client: Omnicane Group
The automation system is based on the GEFanuc SCADA system with two redundant 9030 PLCs connected to IOs on Genius networks.
Most instrumentation was supplied by ECS and all instrumentation installation and commissioning works were done by ECS.

Electrical Infrastructure at Domaine Rosalie
Electrical Infrastructure at Domaine Rosalie
Year of Completion: 2002Site: Le Mount Sugar Estate
Client: Domaine Rosalie
Design, supply and Installation of complete Electrical System was done by ECS.

New Control System for Grays
New Control System for Grays
Design, Supply and Installation of a complete control system was done by ECS.Year of Completion: 2002
Site: Beau Plan
Client: Grays Ltd

Electrical Works for Renovation of Cold Rooms
Electrical Works for Renovation of Cold Rooms
Year of Completion: 2002Site: Moka
Client: Agricultural Marketing Board
Electrical Installation, Design, supply and Installation of complete Electrical System was done by ECS.